Material Summary: Joist
Deck
Structural Steel
Erection
Contract Awarded: July 31, 2006
Tentative Start Erection: September 14, 2006
Interesting Opportunities:
Fabrication Drawings completed by Structural Engineer of Record from the original design 3D Model.
This allowed for direct input into Production Control Software thereby allowing for immediate
Material Ordering and Release to Production.